H1 energy efficiency changes: what 27 November 2026 means for floors
H1 changes: from 27 November 2026, the 6th editions of H1/AS1 and H1/VM1 are the only ones for new consent applications. What that means for floors.

Key numbers
H1 energy efficiency, housing and buildings up to 300 m²
- New editions in force
- 27 Nov 2025
- Last day to lodge using old editions
- 26 Nov 2026
- Non-slab floor minimum (calculation method)
- R1.3
- Heated floor minimum
- R2.5–R3.0
- Slab-on-ground minimum
- Removed for unheated slabs, in the H1/AS1 calculation method only
- Overall level required
- Unchanged, MBIE says
- Replacing floor coverings
- Not affected, on our reading
The new H1 energy efficiency rules aren’t new. They came into force on 27 November 2025 and have been optional for a year.
What ends on 26 November 2026 is the 12-month transition: the old editions can only be used for building consent applications lodged by that date. From 27 November 2026, new applications that rely on MBIE’s H1 acceptable solutions or verification methods must use the new editions.
For floors, the headline change (removing the minimum construction R-value for unheated concrete slabs) happened a year ago and applies to one compliance method only. MBIE says “the overall level of energy efficiency and insulation required remains unchanged”. If you’re just replacing carpet, vinyl, hybrid or timber in an existing home, our reading is that none of this affects you.
This is general information, not legal or design advice.
If you’re lodging a consent now
- Lodging on or before 26 November 2026: either edition. From 27 November 2026: the new (6th) editions only, and the schedule method (fixed R-values for each part of the house) is gone.
- Check with your council which date counts as “submitted”. H1/AS1 6th edition says the old 5th edition “can be used for building consent applications submitted before 27 November 2026”.
- Extension: only the new work has to meet H1, and the rest of the house doesn’t have to be upgraded.
- The insulation level hasn’t changed, MBIE says.
- More detail: BRANZ bulletin BU705, Complying with H1: all housing, and other buildings up to 300 m² (July 2026) is free to read on MBIE’s Building CodeHub.
H1 changes on 27 November 2026
Clause H1 of the Building Code covers energy efficiency. Designers can show a plan complies by following MBIE’s acceptable solution (H1/AS1) or verification method (H1/VM1). For housing, and for other buildings up to 300 m², the 6th editions of both are the only versions for new consent applications from 27 November 2026. Buildings over 300 m² use H1/AS2 and H1/VM2 (2nd editions), which this article doesn’t cover.
In a New Zealand Gazette notice dated 27 November 2025, MBIE issued the new editions and said the previous ones “will be revoked and will cease having legal effect on 26 November 2026”.
| Date | What happens |
|---|---|
| 27 November 2025 | New editions come into force and can be used straight away |
| 26 November 2026 | Transition ends: last day to lodge a consent application using the old editions |
| 27 November 2026 | Only the new editions can be used in new consent applications |
MBIE’s announcement lists five main changes:
- The schedule method is gone. It used fixed R-values for each part of the house. Designers using MBIE’s H1 documents must now use the calculation method in H1/AS1 or the modelling method in H1/VM1.
- Areas are measured differently. Roof, wall and floor areas are now measured using overall internal dimensions.
- Updated modelling. MBIE says the H1/VM1 and H1/VM2 modelling methods were improved “to better align with modern building practices”.
- Framing is counted more accurately. Thermal bridging (heat escaping through timber or steel framing) “is more accurately accounted for”, MBIE says.
- Better tools for windows and slabs. MBIE describes “enhanced tools and tables for windows and slab-on-ground floors to cover more common building scenarios”.
Has the slab insulation rule been scrapped?
No. What’s gone is one minimum, in one method.
An R-value measures how well something resists heat flow, and higher means better insulation. A “minimum construction R-value” is the lowest allowed for one part of the building, counting the whole floor, wall or roof construction, not just the insulation product.
H1/AS1 6th edition lists the removal among its main changes: “In the calculation method, the minimum construction R-value for slab-on-ground floors has been removed.” Here’s what stayed:
- The slab still counts. The calculation method adds up heat loss through the roof, walls, floor, windows, doors and skylights, and the total can be no higher than for a benchmark “reference building” set out in H1/AS1. Heat lost through a poorly insulated slab has to be made up somewhere else.
- The modelling method can be stricter for slabs. Depending on how the modelling software handles slabs, H1/VM1 6th edition can still require a slab to meet a minimum construction R-value.
- Heated slabs keep their minimums (more on that below).
So designers can trade one part against another: a bit less slab insulation, say, for better windows or more in the roof. The house as a whole still has to perform.
How a slab’s R-value is worked out
A slab’s R-value doesn’t come from the insulation product alone. Appendix E of H1/AS1 sets out how the R-value of a slab-on-ground floor is worked out, either from its performance tables or by calculation under H1/VM1. The 6th edition extends Appendix E to cover mixed cladding, partial slab-edge insulation and a wider range of area-to-perimeter ratios. This is the slab part of what MBIE calls “enhanced tools and tables for windows and slab-on-ground floors to cover more common building scenarios”.
Where a concrete floor is only partly on the ground, H1/AS1 treats the part on the ground as a slab and the rest as a suspended floor. CodeHub also has BRANZ’s Build magazine article Specifying slab floors that comply with H1 (Build 192, 2022).
Does my house need more insulation now?
Not because of this. MBIE says the level required is unchanged and describes the changes as giving designers more flexibility in how they show compliance.
Underfloor insulation requirements for suspended floors, heating and carpet
Suspended timber floor insulation in a new build
Suspended floors sit on joists over a subfloor space. Under the calculation method in H1/AS1 6th edition, any floor that isn’t slab-on-ground must reach at least R1.3. As with slabs, the whole building still has to meet the reference building benchmark.
What’s gone is the schedule method, which gave suspended floors a fixed R-value for each climate zone. In guidance written for the previous editions, BRANZ noted that “a reasonably wide range of high component R-value insulation options are available” for suspended timber floors. It also advised covering the subfloor ground with 250 micron polyethylene sheet, with the joins taped.
Underfloor heating and H1 minimum R-values
Under H1/AS1 6th edition, heated floors have their own minimum construction R-values:
- R2.5 in climate zones 1–3
- R2.8 in zone 4
- R3.0 in zones 5–6
Your designer can confirm your zone, and MBIE publishes H1 climate zone information on building.govt.nz.
What’s new is an exception: these minimums no longer apply where the floor heating is only in rooms with a shower, bath or toilet. Planning underfloor heating in the living areas? In a new build or extension, the minimum still applies there.
Do carpet and underlay count towards floor insulation?
H1/AS1 6th edition says the construction R-value of floors other than slab-on-ground floors is worked out “ignoring the effect of floor coverings (including carpets)”. BRANZ’s House insulation guide says the same for floors generally: “Floor coverings, including carpets, are not counted in the construction R-value.”
Carpet and underlay can make a cold room feel warmer, as our comparison of carpet, vinyl and hybrid notes. Just don’t count on them to make up for insulation missing from the floor itself.
Checklists for new builds and floor installers
New builds: what to ask your designer or builder
- Which H1 method are you using, the calculation method or the modelling method, and which edition?
- What R-value does the plan give the slab or suspended floor, and how does that fit the whole-building result?
- If we’re having underfloor heating, does the floor meet the heated-floor minimum for our climate zone?
- Was our consent application lodged before 27 November 2026?
If you work in floors
On our reading, the new editions affect your clients’ design choices rather than how you lay a floor covering. But on new builds and extensions using H1/AS1 or H1/VM1, the heated-floor minimums apply unless the heating is only in rooms with a shower, bath or toilet. Before adding underfloor or undertile heating in an existing home, check with the designer or council.
Renovations and extensions
For additions, MBIE’s guidance says: “The new construction must meet the requirements of clause H1 but the rest of the building does not have to be upgraded to comply with H1.” The altered house can’t end up less energy efficient than it was.
If you replace a small part of the building envelope (the walls, roof and floor that separate inside from out), MBIE says the home’s overall thermal resistance shouldn’t drop. MBIE treats replacing large parts as similar in effect to an extension. From 27 November 2026, extension consent applications that rely on H1/AS1 or H1/VM1 must use the new editions.
Existing homes: replacing floor coverings and adding insulation
Replacing carpet, vinyl, hybrid or timber in an existing home
On our reading, you’re not affected, and MBIE’s guidance points the same way:
- No consent is needed. Schedule 1, exemption 12 of the Building Act covers replacing floor finishes in an existing home, although exempt work must still meet the Building Code. Our explainer on the Building Amendment Bill covers that exemption and where it stops. (That bill is unrelated to H1.)
- H1 sets no R-value for replaced parts. MBIE’s guidance on repairs and replacements says the H1 documents “are designed primarily for new buildings”, and that Clause H1 “does not specify the thermal resistance that is required for each repaired or replaced building element”.
Floor coverings don’t count towards a floor’s R-value in any case, as covered above. Nothing from MBIE says in so many words that replacing carpet is outside the 2026 changes. If your floor job turns into structural work, wet-area waterproofing or new underfloor heating, ask your council.
Adding underfloor insulation
In an existing home, exemption 13 of Schedule 1 means adding underfloor insulation doesn’t need a building consent. If you can’t get under the floor, MBIE says a good time to insulate is when you’re already working on the floor, such as re-piling or replacing floorboards.
Is this the same as the Healthy Homes insulation rules?
No. Healthy Homes is a separate tenancy rule for rentals, and the H1 changes don’t alter it. For rentals consented before 3 November 2022, it requires underfloor insulation of at least R1.3 in all three of its climate zones (which are separate from H1’s), with new insulation installed to NZS 4246:2016.
Methodology and sources
Checked 24 Nov 202615 sources
Checked on 24 November 2026. Dates and edition details come from the Gazette notice, MBIE and the H1/AS1 6th edition document status. Direct quotes are from the Gazette notice, H1/AS1 6th edition, MBIE and BRANZ. The BRANZ floors guidance and the House insulation guide we link were written for the previous H1 editions; H1/AS1 6th edition cites the House insulation guide’s 6th edition (August 2025 version). Our conclusions that replacing floor coverings in an existing home isn’t affected, and that the changes affect design rather than floor laying, are our reading of MBIE’s guidance and the Building Act, not statements from MBIE. We didn’t compare old and new floor R-values in detail. Insulation sellers’ claims were left out.
MBIE and the Gazette (4)
The H1 documents (2)
BRANZ and CodeHub (4)
Existing homes, extensions and rentals (5)
- Building Performance: building work repairs, replacements and alterations, H1 compliance
- Building Performance: Schedule 1 exemption 12, internal linings and finishes in an existing dwelling
- Building Performance: Schedule 1 exemption 13, thermal insulation
- Building Performance: insulation for existing homes
- Tenancy Services: Healthy Homes insulation standard
If new floors are next on your list, read our step-by-step guide to what to expect from a flooring installation.